September 10, 2026
As reported by Shelby Chamber Alliance, "The mall needs housetops in close proximity."
That is how Les Binkley, senior vice president at Boyle Investment Company, explained why apartments are rising two minutes from some of Collierville's quietest estate lots. He was talking about foot traffic for Carriage Crossing. As reported by The Daily Memphian, the parcel's apartment entitlements date to 1998, before most of today's board members held office, and the project is only now working its way out of the ground.
If you are comparing a private-drive lot in Halle Plantation to a similarly priced property somewhere else in Collierville, that distinction matters more than square footage.
On November 11, 2024, Collierville's Board of Mayor and Aldermen approved the preliminary site plan for Morrison Village on a 5-1 vote, with Alderman Billy Patton casting the lone no. The Planning Commission had already endorsed it unanimously that September. But the part of the record worth sitting with isn't the vote count. It's what Alderman John Worley said about it, as reported by Shelby Chamber Alliance: the apartment entitlements on that parcel were granted back in 1998, "prior to any of us being on this board."
The entitlement history adds context to descriptions such as "quiet, established, low-turnover street," which describe the current streetscape.
Boyle announced the $50 million project on February 6, 2026, and vertical construction started that same January on the 11.5-acre site at the southeast corner of South Shea Road and Houston Levee Road, just north of the Highway 385 exit. Here's the shape of it as of this fall:
| Component | Scale | Target |
|---|---|---|
| Shell retail space | Roughly 28,600 square feet | Complete by end of 2026 |
| Live-work units | 8 | Part of the current build phase |
| Apartment flats | 100, with 72 studio or one-bedroom | Leasing begins summer 2027 |
| Hotel parcel | One reserved pad | Later phase, no date set |
| Child-care facility | 1 | Already completed, counted as Phase 1 |
Boyle also folded in a build-to-suit retail pad at the future signalized corner of Shea and Houston Levee, along with direct access to the greenbelt trail near Nonconnah Creek. The company set aside more than 30 acres of surrounding land as passive parkland connected to the town's greenbelt system.
Drive the stretch of South Houston Levee Road south of 385 and you'll pass entrances to Halle Plantation, Lakewood, Almadale Farms, and Wynbrooke Grove, along with smaller enclaves like Houston Levee Manor. These are lot sizes measured in acres, not square feet. Several sit on private drives shared by a handful of homes. That is a real and valuable feature of the corridor, and it isn't going away on any of those individual lots.
What's changing is the corridor those lots open onto. Shelby Chamber Alliance reported Binkley describing Morrison Village as one node in a larger push: "From a placemaking standpoint, this complements what The Parke is doing. It's just a neighborhood commercial node that can provide services for all the housetops north on Shea Road." Here, housetops refers to the nearby homes that those businesses could serve.
The other projects he's referring to aren't rumors. Jason Crews is building residential components at The Parke at Houston Levee. Grant & Co., along with John and Joel Porter, has additional residential projects further south on the same road. None of these are secret. Shelby Chamber Alliance reports that the land use plan already designated this stretch as a mixed-use activity center that can accommodate office, retail, hotel, and residential uses.
If you're shopping the Houston Levee corridor against a comparably priced property elsewhere in Collierville, three considerations may be useful when comparing properties:
None of this means the corridor is a worse place to buy. Boyle's own materials frame the surrounding parkland and greenbelt trail access as a genuine amenity, and that part is real and already in the ground plan. It means the corridor's character over the next two to three years is more legible if you know which decisions are locked in and which are still open.
Does this affect every subdivision along Houston Levee, or just the ones closest to Shea Road? The traffic and retail impact is concentrated closest to the Shea Road and Houston Levee intersection, since that's where the signalized corner and build-to-suit pad are planned. Estate lots further north or south on Houston Levee are further from the immediate construction but still sit on the same corridor that town planning documents already designate for this kind of mixed use.
Could more apartment or commercial entitlements get added to this same corridor? Not without a new approval process. The 1998 entitlement covers the specific Morrison Village parcel. Other nearby projects include The Parke at Houston Levee and residential projects associated with Grant & Co. and the Porter family.
When will the retail space actually be open for business? Boyle's own timeline targets shell retail completion by the end of 2026, with residential leasing following in summer 2027. Shell completion means the buildings are ready for tenants, not that specific businesses have signed on yet.
If you're weighing a property along this corridor against something in another part of Collierville, I'd rather walk the specific parcel with you than let a listing description do the talking. Reach out to Lauren Haynes and let's connect.
This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.
Stay up to date on the latest real estate trends.
I approach every transaction with integrity, focus, and a commitment to delivering a seamless experience. From strategy to closing, I’m here to provide steady guidance tailored to your needs.